Connect · PLM

PLM: from design to delivery, connected

When product lifecycle data and ERP don't talk, engineering changes arrive late, BOMs drift and cost surprises appear on the shop floor. We connect PLM to Dynamics 365 and to Connected Intelligence — so design decisions flow straight into production, purchasing and cost.

What we connect

The engineering-to-operations thread

01

Items & BOMs

Engineering BOMs released from PLM become manufacturing BOMs and routings in Dynamics 365 — with revisions kept in step.

02

Engineering change

Change orders flow to ERP with effectivity dates, so purchasing, planning and production act on the right revision.

03

Documents & specs

Drawings and specifications available where operators, buyers and quality teams need them.

04

Configure, price, quote

Product rules from PLM feed CPQ and CRM so sellers quote what engineering can build.

05

Quality feedback

Field service and quality data flow back to engineering to close the loop on design.

06

Cost visibility

Rolled-up standard costs and variances visible to engineering before changes are released.

PLM in the AI world

A change-impact agent, with a human in the loop

When an engineering change is raised, an agent assembles its impact — open orders, stock on hand, open purchase orders, work in progress and cost — and recommends an effectivity date. The engineering and operations owners approve it.

Human-in-the-loop level: Approve

  • Agent drafts the impact summary and recommendation
  • Engineering and operations approve
  • Every decision logged against the change order
FAQ

Frequently asked questions

What PLM data do you connect to Dynamics 365?

Items, engineering and manufacturing BOMs, revisions, engineering change orders with effectivity dates, documents and specifications, product configuration rules for CPQ, and quality feedback from service.

How does AI help with engineering change?

A change-impact agent assembles the effect of an engineering change on open orders, stock, purchase orders, work in progress and cost, and recommends an effectivity date for engineering and operations owners to approve.

Engineering changes causing shop-floor surprises?

Talk to us about connecting PLM to Dynamics 365.

Request an AI discovery →